HV Battery Introduction & Installation

1. Battery Introduction 

1.1 Appearance Introduction 

 

2. Packing List 

 

3. Mechanical Installation

3.1 Selection of Installation Location:

  • The area is completely water proof. The floor is flat and level. 
  • There are no flammable or explosive materials.
  • The ambient temperature is within the range from 0 to 50.
  • The temperature and humidity is maintained at constant level. There is minimal dust and dirt in the area.
  • The distance from heat source is more than 2 meters.
  • The distance from air outlet of whole system is more than 0,5 meters. Do not cover or wrap the battery case or cabinet.
  • Do not place at children or pet touchable area. The installation area shall avoid of direct sunlight.
  • There is no mandatory ventilation requirements for battery module, but please avoid of installation in confined area (minimum 300mm to top/left/right/front).
  • The aeration shall avoid of high salinity, humidity or temperature.

 

3.2 General instalation steps:

1) Install the base;

2) Install the battery module and Sub-Master BMS;

3) Install the inverter;

4) Cables connection;

5) Install the wall mounting support. 

 

3.3 Install the kit for wall mounted:

Mounting the kit for wall mounted and tighten them with M6 plastic expansion pipes and self-tapping screws and screws. 

 

3.4 Cables Connection:

After mechanical installation is finished, here are positive power line, negative power line, communication cable and earth cable between inverter and Sub-Master BMS need to be connected. 

! Please make sure the main switch at OFF position during installation to guarantee high voltage protection ! 

 

3.4.1 Battery power connector assembly procedures

 

3.4.2 Communication connection

The one side of the communication cable used to connect the inverter and BMS port is preinstalled on the inverter before leaving the factory, insert the other side to the "Inverter COM" port in the BMS when installing it.

 

3.4.3 Ground terminal connection

Fix the grounding terminal to the PE wire with a proper tool and lock the gorunding terminal to the grounding hole in the top of the BMS. 

 

4. System Start and Stop

4.1 Start system:

 

4.2 Stop system:

 

5. Technical Parameters