1.1) Local Configuration:
1.2) Parameters setting:
1.3) Work Mode Selection:
- Find the "General Settings" by short pressing the button on the inverter screen.
- Enter the "General Settings" by long pressing the button on the inverter screen.
- Find "WorkMode Set" by short pressing the button, then select work mode by short pressing and long pressing the button on the inverter screen.
1.4) Battery Model Selection:
The battery model will need to be configured on inverter screen.
- Find the "General Settings" by short pressing the button on the inverter screen.
- Enter the "General Settings" by long pressing the button on the inverter screen.
- Find "Battery _ ID Set" by short pressing the button, then select battery model by short pressing and long pressing the button on the inverter screen.
1.5) Export Limit Setting:
- Enable the Export Limit function by short pressing or long pressing the button on the inverter screen.
- Set the percentage of the power that allowed to feed into grid, when set to XXX%, it means that the maximum allowed feed in grid power is XXX% of the inverter’s rated output power. If you Zero Export, you need to set the percentage to 0%.
2.1) Local Configuration:
2.2) Sunways Setup App:
3) Remote Configuration:
4) Register account:
5) Create a Plant:
Step 1:Log in to the overview screen, tap [Me]
Step 2:In [Me] screen, tap [Plant management] , enter the page and click「+」in the upper-right corner
Step 3:Enter the PV plant information as required, including [Device Scanning]-[Installation Info]-[Other Info] After completed, tap [Complete], end.
6) ADD Device:
Precondition: You already have created PV plant on monitoring. If not, please operate as last page(Create a Plant).
Step 1:Log in to the overview screen, tap [Me]
Step 2:In [Me] screen, tap [Plant management] , enter the page and click「+」in the upper-right corner
Step 3:Enter the device information as required, tap[Select plant] down the page, choose the right related plant, complete.